Commit graph

6 commits

Author SHA1 Message Date
Content Agent
362548caad refactor: rename phases to sequential A→B→C→D
Old: D (Open Standard) → C (Consulting) → A (SaaS) → B (Compliance)
New: A (Open Standard) → B (Consulting) → C (SaaS) → D (Compliance)

Updated: README.md, strategy.md, plan-flow.svg, landing page
2026-04-28 21:09:42 -07:00
Content Agent
2fe706436d fix: clean up architecture and plan-flow SVGs — simpler connector routing, tighter arrow spacing 2026-04-28 16:24:11 -07:00
Content Agent
0ea2204d5b fix: compact speckdl-pipeline.svg — was way too tall for a 4-box flow 2026-04-28 16:15:42 -07:00
Content Agent
c9b746d7d4 fix: redo consulting-pipeline.svg — proper arrows and layout 2026-04-28 16:14:35 -07:00
Content Agent
7b3a09f48a fix: redo plan-flow.svg — fix overlapping elements and arrow connections 2026-04-28 16:13:20 -07:00
Content Agent
f59488a197 feat: replace ASCII art diagrams with SVG
- README: SpeckDL pipeline and architecture diagrams
- docs/strategy.md: Plan D→C→A→B flow diagram
- docs/consulting-packages.md: consulting pipeline flow diagram
- New: docs/diagrams/ with 4 static SVGs (dark-mode compatible, responsive viewBox)
2026-04-28 16:01:00 -07:00