Commit graph

1 commit

Author SHA1 Message Date
Scott Scoble
45ee6fc1bc docs: sync Phase 2 content pipeline — all 5 blog posts + publishing toolkit
Some checks failed
Deploy Landing Page to Storj / deploy (push) Failing after 2s
blog-01: Spec-Code Drift Is a Provenance Problem (~1,500 words)
blog-02: Designing SpeckDL (~1,800 words)
blog-03: How Speckl's Compiler Works (~1,900 words)
blog-04: Embedded Provenance (~1,200 words)
blog-05: Consensus Protocols in SpeckDL (~1,300 words)
publishing-toolkit: Dev.to/Medium/Reddit/HN formatting + objection prep (~3,500 words)

Total Phase 2 pipeline: ~11,200 words across 6 files.
Previously existed only in workspace copy (posts 1/3/toolkit) or
as untracked files (posts 2/4/5). All now committed to Forgejo.
2026-05-09 00:11:29 -07:00